The Barn Project - Page 11 June 2008 and the basic shell is up and now the work really happens inside. |
|||||||||
![]() |
||||||||||
|
The above picture now shows a completed shell. All roofing has been completed by Ian Young roofing on 07906 590626. The slate roof is the octagonal kitchen and note the hips are bonded . We thought is would look over powering with 4 hips and a ridge all in stone. Some features have been created including the arrow slits on the main barn and we have re-used the old ties from the old brickwork. A total of 480 tonnes of earth was removed to create two stepped level areas. The bottom for a driveway and the upper for a lawn. The smaller picture below shows, on the left hand side, the link building and office. Further pictures showing the internal arrangement will follow. |
||||||||||
|
The inside of the kitchen now shows the large octagonal truss. Each leg that sits on the breeze blocks will have a decorative brick pillar supporting each one. The purlins create a teepee effect and when plastered, the entire ceiling will be lit with concealed lights creating a stunning room to entertain and relax. |
![]() |
|||||||||
![]() |
||||||||||
|
|
||||||||||